Jump to content

Almost finished, test ran today!


Recommended Posts

your knee plate is on your left leg shin upside down.

you will need to flip it around.

 

on your right leg, you will have to move the power cells from the shin

up to the thigh plate.

 

your lower legs need those fine tuning elements to be properly fitted.

 

 

otherwise it looks pretty good.

now get out that rivet gun and drill and just move those parts around.

 

check your screenshots again...

 

good job so far...

Edited by TK Bondservnt 2392
Link to comment
Share on other sites

Something that was pointed out to me a few days back was that the vocoder should rounded off in the middle three so it does not look like it has been blended into one. It might just be that the picture is not clear enough though. But from what i do see it looks like the middle three lines have blended into one.

 

In the fourth and fifth pictures is that a gray strap i see?

 

But yea you are off to a good start.

Link to comment
Share on other sites

Good start so far! Your drop boxes need to be attached with with straps and lowered, and it almost looked like your butt plate was over your belt. It also looks like your shins need to be lowered, and don't forget to re-do your ab buttons with correct sizes and colors.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...