Assembly cont....   6d. Ab to Kidney left side strapping   In this section I'll be illustrating how assembly the left side Ab to Kidney strapping using Anovos supplied components except for paint, which will be needed to paint the rivet heads.   Using the following items from the Anovos kit, cut three 1-1/2" strips of the 1" nylon webbing.      If you drilled the holes in the Ab and Kidney as specified in the pre-assembly section (which was 10mm from the edge) then the distance bet
    • Like
    1